TM 10-3930-675-10
0007 00-19
PREPARATION FOR TRANSPORT - CONTINUED
0007 00
AIR TRANSPORT - CONTINUED
h.
Turn bogie wheels retaining collar ¼ turn clockwise to lock bogie wheels in stowed position.
i.
At front of vehicle, close both shutoff valves #6.
j.
At side of locking valve at base of each lift cylinder, loosen float valve jamnut and turn float valve clockwise until
tight. Retighten jamnut.
k.
Remove dolly wheels from tophandler:
(1) Remove two retaining pins and lower and upper pin from each dolly wheel. Remove dolly wheel from tophan-
dler.
(2) Reinstall lower and upper pin in dolly wheel and secure with retaining pins.
WARNING
Ensure that tabs on ramp are engaged into ramp seat holes in dolly wheels storage compartment. Failure to
secure ramp properly may cause ramp to fall under weight of dolly wheel, causing injury to personnel.
l.
Using ramp, stow dolly wheels in dolly wheels storage compartment. Stow ramp inside storage compartment and
secure with straps.
m. Raise boom to approximately 13 ft (4 m) height.
n.
Raise boom support (refer to Placing Boom Support in Transport Position).
o.
Retract and lower boom.
CAUTION
To ensure tophandler does not contact underside of boom, exercise tilt function and lock tophandler in tilted
position while rotating tophandler. Failure to do so may damage tophandler and/or boom.
p.
Rotate tophandler 90° clockwise to operational position.
q.
Return cab to operational position (refer to Placing Cab in Transport Position).
r.
Shut down RTCH engine.
s.
Fill fuel tank (WP 0015 00).
