TM 10-3930-675-20-2
0148 00-2
BOOM-TO-BOOM EXTENSION FLEXIBLE CONVEYER MAINTENANCE - CONTINUED
0148 00
NOTE
Tag all hydraulic lines.
Remove and discard tiedown straps as necessary to gain free movement in hydraulic hoses and wiring
harnesses.
REMOVAL
1.
At right-rear of boom (4), remove two screws (2) and disconnect connector (5) of boom wiring harness (3) from connec-
tor (1).
2.
Disconnect connector (7) of cable (6) from connector (8).
3.
Remove boom wiring harness (3) and cable (6) from attachment to right side of boom (4).
4.
At right-front of boom (4), remove locknut (10), two washers (11), screw (12), and clamp (13) from conveyer support
bracket (9). Discard locknut.
5.
Remove clamp (13) from boom wiring harness (3) and cable (6).
1
2
3
4
5
6
7
8