Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-10-3930-675-20-2_670
AIR CONDITIONER FANS REMOVAL - CONT
TM-10-3930-675-20-2 Rough Terrain Container Handler (RTCH): RT 240; 53 000 Lb Capacity; 4x4 Manual
Page Navigation
556
557
558
559
560
561
562
563
564
565
566
TM 10-3930-675-20-2
0190 00-1
AIR CONDITIONER FANS MAINTENANCE
0190 00
THIS WORK PACKAGE COVERS
Air Conditioner Fans: Removal, Installation
Relays
and Resistors: Removal, Installation
INITIAL SETUP
Tools and Special Tools
Tool kit, general mechanic’s (Item 31, WP 0204 00)
Materials/Parts
Strap, tiedown (Item 27, WP 0203 00)
Tag, marker (Item 28, WP 0203 00)
Materials/Parts - Continued
Nut, lock (P/N 920076.001) (6)
Nut, lock (P/N 920076.002) (8)
Equipment Condition
Master battery switch in OFF position
AIR CONDITIONER FANS REMOVAL
1.
Remove ten screws (2) to free cover (3) assembly from
condenser
fan box (1).
1
2
3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business