TM 10-3930-675-20-2
0060 00-6
ETHER COLD START SYSTEM MAINTENANCE - CONTINUED
0060 00
COLD START ACTIVATION SOLENOID REMOVAL - CONTINUED
7.
Remove ether supply tube (9) thru grommet (6) in mounting bracket (10).
COLD START ACTIVATION SOLENOID INSTALLATION
1.
If removed, feed ether supply tube (9) thru grommet (6) in mounting bracket (10).
2.
Connect ether supply tube (9) to fitting (13) at air intake elbow (14).
6
4
7,8
9
10
14
13
9