Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
ETHER COLD START SYSTEM MAINTENANCE - TM-10-3930-675-20-2_71
ETHER CANISTER INSTALLATION - CONT
TM-10-3930-675-20-2 Rough Terrain Container Handler (RTCH): RT 240; 53 000 Lb Capacity; 4x4 Manual
Page Navigation
37
38
39
40
41
42
43
44
45
46
47
TM 10-3930-675-20-2
0060 00-2
ETHER COLD START SYSTEM MAINTENANCE - CONTINUED
0060 00
ETHER CANISTER REMOVAL - CONTINUED
2.
Inspect gasket (5) for damage. Remove and discard only if damaged.
ETHER CANISTER INSTALLATION
1.
Ensure gasket (5) is positioned inside top of
solenoid
(4).
2.
Position canister (1) inside clamp (2). Install to
solenoid
(4) by turning canister clockwise.
3.
Tighten clamp screw (3).
5
4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business