TM 10-3930-675-24-2
SPREADER 20 AND 40 FOOT ADJUSTMENT
THIS WORK PACKAGE COVERS
Measurement and Adjustment - 20 ft
Measurement and Adjustment - 40 ft
INITIAL SETUP
Personnel Required
Maintenance Level
Organizational
Two
Tools and Special Tools
References
Tool Kit, General Mechanic's (Item 128, WP 0289
TM 10-3930-675-10
36 mm Open-End Wrenches (2)
Equipment Condition
Materials/Parts
Wheels chocked
Parking brake applied (TM 10-3930-675-10)
Tophandler in normal operating position with
spreader motor on left side (TM 10-3930-675-
10)
Washers (as required)
MEASUREMENT AND ADJUSTMENT - 20 FT
1.
Check tophandler chain tension and adjust if necessary (WP 0168 00)
2.
Operate tophandler spreader to 20-ft position (TM 10-3930-675-10).
3.
Ensure stop blocks (1) are bottomed out on both ends of spreader sections (2).
1
2
434-40156