TM 5-3810-306-34
b. Install new preformed packing (96), shims (95)
11. INSTALL SHIFT COUPLING (75).
and rear axle disconnect housing (94). Install
a. Locate shifter fork (73) in gear hub (118) with
Torque capscrews (92) 115-127 ft-lbs (153-169
offset of fork toward front of transmission.
Nm).
b. Assemble shaft (81), seal (80), spring (79), ball
c.
Tap output shaft (114) front and rear to seat
(78), and pipe plug (77).
c.
Install shaft coupling (75) with new preformed
10. CHECK ROLLING TORQUE.
packing (76).
a. Loosen capscrews (92).
d. Install and torque two bolts (74) to 23-25 ft-lbs
(31-33 Nm ).
b. Using pound-inch torque wrench, determine and
record rolling torque of output shaft.
e. Locate setscrew hole in shaft (81) and shift fork
(73). Install setscrew (72) and lockwire to
c.
Tighten capscrews (92) to 115-127 ft-lbs (153-
prevent loosening.
169 Nm ).
12. INSTALL FLANGE (85).
d. Determine and record rolling torque of output
shaft.
a. Install flange (85).
e. Compare recorded torque from step b. and step
b. Install new preformed packing
(84),
new
d. If value recorded in step d. is between 6 and
lockwasher (83) and nut (82).
8 pound-inches (8-11 Nm ) greater than that
recorded in step b, bearing preload is correct.
c.
Torque nut (82) 200-250 ft-lbs (266-333 Nm ).
Otherwise add or subtract shims (95) as
required to achieve proper bearing preload.
7-50