TM 5-3810-306-34
3. REASSEMBLE CONTROL END.
CAUTION
a. Install new seal (6) into housing (16).
Be extremely careful that parts do not
tilt out of position while entering.
b. Lubricate and install needle bearing set (8) on
Push parts gently into place with a
spool (18) in housing (16).
slight rotating action. Keep the pin
(19) nearly horizontal. Bring spool
c.
Install new oil seal (3) into bushing (5). Flat or
assembly entirely within housing (16)
smooth side of oil seal (3) must face in towards
bore until parts are flush at meter end
bushing (5).
or fourteen hole end of housing. Do
not pull spool assembly beyond this
d. Install quad ring (7) in bushing (5). Install
point to prevent the cross pin from
bushing over spool end until seated on bearing
dropping into discharge groove of
(8).
housing. With spool assembly in this
flush position, check for free rotation
e. Secure assembled part with retaining ring (4).
within housing by turning with light
fingertip force at splined end.
4. REASSEMBLE GEROTOR END.
a. Install new packing (21) and spacer plate (22).
Align holes in spacer plate (22) with those in
housing (16).
10-7