TM 10-3930-675-24-2
TOPHANDLER TWISTLOCK CYLINDER REPLACEMENT - CONTINUED
0175 00
REMOVAL
NOTE
A container may be placed under drain opening on underside of spreader beam, inbound from twist-
lock, to catch draining hydraulic fluid.
1.
Loosen fitting nuts (6) and disconnect two tees (8) from fittings (4). Cap/plug hydraulic openings.
2.
At each end of cylinder (5), remove retaining pin (1), spacer (2), and shaft (3).
3.
Remove cylinder (5) from mounting bracket (9) and link (7).
4.
Remove two fittings (4) from cylinder (5).
5
1,2,3
4
5
1
2
6
4
3
7
6
8
9
INSTALLATION
NOTE
Refer to General Maintenance Instructions (WP 0284 00) for complete instructions on connecting
hydraulic hoses and applying proper torque.
1.
Install two fittings (4) on cylinder (5).
2.
Align cylinder (5) to mounting bracket (9) and link (7).
3.
At each end of cylinder (5), install shaft (3), spacer (2), and retaining pin (1).
4.
Remove cap/plug from hydraulic openings and connect two tees (8) to fittings (4). Tighten two fitting nuts (6).
5.
6.
7.
Start engine (TM 10-3930-675-10), operate twistlock cylinders, and check for leaks.
NOTE
Replace hydraulic reservoir return filters after 100 hours of operation (WP 0185 00).
END OF WORK PACKAGE
0175 00-2