TM 10-3930-675-24-2
TOPHANDLER WIRING HARNESSES REPLACEMENT - CONTINUED
0221 00
WIRING HARNESS B, TOPHANDLER JUNCTION BOX-TO-CONTROL VALVE: INSTALLATION
CAUTION
Ensure sufficient length of wiring harness is coiled within tophandler opening, so that tophandler can
rotate freely in both directions without damaging harness.
1.
Attach wiring harness B (12) control valve wire leads to upper end of nonelectrical wire.
2.
With assistance, pull nonelectrical wire and wiring harness B (12) down through tophandler carriage frame.
3.
Remove wiring harness B (12) leads from nonelectrical wire.
4.
Connect wire leads to solenoids (13) as follows:
14,15
13
12
12
16
WIRE NUMBER
6008
Rotation Clockwise
6009
Rotation Counterclockwise
6010
Tilt Out
6011
Tilt In
6018
Spreader Out
6019
Spreader In
5.
Connect lead 6034-1 to leveling lock solenoid (16).
6.
Install cable clamp (15) on wiring harness B (12) grommet with screw (14).
0221 00-6