TM 9-3950-253-13&P
0071
INSTALLATION
1.
Install plate (Figure 5, Item 8), two washers (Figure 5, Item 9), bolts (Figure 5, Item 10), washers (Figure 5,
Item 7), and new locknuts (Figure 5, Item 6) on lift frame (Figure 5, Item 1).
WARNING
Lifting cables, chains, hooks, and slings used for lifting must be in good condition
and of suitable capacity.
Improper use of lifting device and improper attachment of cables may cause injury
to personnel and damage to equipment. Observe all standard rules of safety.
Use extreme caution when handling heavy parts. Provide adequate support and
use assistance during procedure. Ensure any lifting device used is in good
condition and of suitable load capacity. Keep clear of heavy parts supported only
by lifting device.
Failure to follow these warnings may result in injury or death to personnel. Seek
medical attention in the event of an injury.
NOTE
Upper lock assembly weighs 90 lb (41 kg).
Perform these procedures for both right and left sides.
Install upper lock assembly on lift frame as noted during removal.
2.
Attach sling and lifting device to upper lock assembly (Figure 1, Item 5).
3.
Use lifting device to install upper lock assembly (Figure 5, Item 5) on lift frame (Figure 5, Item 1).
4.
Install stop block (Figure 5, Item 4), two washers (Figure 5, Item 3), and new locknuts (Figure 5, Item 2) on
lift frame (Figure 5, Item 1).
5.
Remove lifting device and sling from upper lock assembly (Figure 5, Item 5).
0071-8
03/15/2011Rel(1.10)root(maintwp)wpno(M582070)