TM 9-3950-253-13&P
FIELD MAINTENANCE
LIFT FRAME BAIL BAR REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Tool Kit, General Mechanic s (WP 0118, Table 2,
(Two)
Item 2)
Tool Set, SATS Base (WP 0118, Table 2, Item 3)
References
Wrench, Torque, 3/4-Inch Drive, 600 lb-ft
Equipment Condition
Materials/Parts
Lift frame placed on level ground and supported
by hook arm or alternate lifting device
0072-1
03/15/2011Rel(1.10)root(maintwp)wpno(M582071)