TM 9-3950-253-13&P
FIELD MAINTENANCE
LIFT FRAME CONTAINER PIN REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
References
Tool Kit, General Mechanic s (WP 0118, Table 2,
Item 2)
Equipment Condition
Materials/Parts
Lift frame placed on level ground and supported
by hook arm or alternate lifting device
REMOVAL
NOTE
Perform steps 1 and 2 for both right and left sides.
1.
Remove locknut (Figure 1, Item 5) and washer (Figure 1, Item 4) from container pin (Figure 1, Item 2).
Discard locknut.
2.
Release anti-loose fastener (Figure 1, Item 3) and remove container pin (Figure 1, Item 2) from lift frame
(Figure 1, Item 1).
Figure 1. Container Pin.
END OF TASK
03/15/2011Rel(1.10)root(maintwp)wpno(M582073)