TM 10-3930-675-24-2
TOPHANDLER JUNCTION BOX REPLACEMENT - CONTINUED
0222 00
REMOVAL - CONTINUED
3
5,6
8
9
7
10
11
14
15,16
13
12
NOTE
Tag wires to ensure proper connection on installation.
9.
At bottom of junction box (3), disconnect connectors (21) of four cables (22).
10.
Loosen cap (20) on fitting (19) and remove fitting from junction box (3).
11.
Trace route of three wires (17) of cable (18) to connecting point and disconnect wires. Note connecting point.
12.
Pull cable (18) out from junction box (3).
17
3
18
19
20
21
22
0222 00-3