TM 10-3930-675-24-2
TOPHANDLER JUNCTION BOX REPLACEMENT - CONTINUED
0222 00
INSTALLATION - CONTINUED
12.
Push wires (12) of three cables (11) into junction box (3).
13.
Connect wires (12) of three cables (11) to connecting points, as noted during removal.
14.
Push wires (7 and 14) into junction box (3).
15.
Install five fittings (9) in junction box (3) and tighten five caps (10).
16.
Connect terminal of small black wires (13) and terminal of large black wire (14), marked "red", to terminal stud and
install washer (16) and new locknut (15).
17.
Connect terminal of small white wires (8) and terminal of large black wire (7), marked "black", to terminal stud and
install washer (6) and new locknut (5).