• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Unknown' by Unknown - Page 74 of 720
'Unknown' by Unknown - Page 76 of 720

PALLETIZED LOAD SYSTEM TRUCK, M1075 AND M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 ENHANCED CONTAINER HANDLING UNIT
Page Navigation
  26    27    28    29    30  31  32    33    34    35    36  
img
. .
TM 9-3950-253-13&P
0007
RETRIEVE LIFT FRAME - Continued
Retrieve Lift Frame - Stage 2
1.
At stowage control panel (Figure 8, Item 1), press and hold UP button (Figure 8, Item 2) until hook arm
stops. Release UP button.
2.
Verify both stowage rollers (Figure 8, Item 5) are clear of stowage guide rails (Figure 8, Item 6).
3.
If stowage rollers (Figure 8, Item 5) are not clear of guide rails (Figure 8, Item 6), press and hold UP button
(Figure 8, Item 2) again.
4.
Press and hold STOW button (Figure 8, Item 8) until stowage guide (Figure 8, Item 6) stops at fully forward
position. Release STOW button.
5.
Set stowage toggle switch (Figure 8, Item 7) to OFF position. Lift frame (Figure 8, Item 4) should now be
supported in hook (Figure 8, Item 3) and ready to be unloaded.
Figure 8. Retrieve Lift Frame - Stage 2.
END OF TASK
UNLOAD AN EMPTY LIFT FRAME
1.
Verify these conditions exist:
a.
Lift frame supported by hook (Retrieve Lift Frame - Stage 2).
b.
Bail bar lock installed on hook (Retrieve Lift Frame - Stage 1).
c.
MODE switch set to OFF position (PLS: TM 9-2320-364-14&P, HEMTT: TM 9-2320-326-14&P).
d.
Stowage toggle switch set to OFF position (WP 0004).
e.
NO TRANS light off (PLS: TM 9-2320-364-14&P, HEMTT: TM 9-2320-326-14&P).
0007-7
03/15/2011Rel(1.10)root(opusualwp)wpno(O582007)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.